Installation#
Warning
The following places should be avoided:
Within the reach of high voltage operated equipment.
Places exposed to direct impact of solar radiation.
Installation Procedure#
Mount the clock into a 19″ rack cabinet.
Terminate all supply cables on the rear side (230 V power supply via EURO connector).
Connect the DCF receiver / GPS antenna, Slave clock line cables, switch circuit and power cable.
Switch-on 230 V mains power. The current time is displayed on the Master clock.