Installation#

Warning

The following places should be avoided:

  • Within the reach of high voltage operated equipment.

  • Places exposed to direct impact of solar radiation.

Installation Procedure#

  1. Mount the clock into a 19″ rack cabinet.

  2. Terminate all supply cables on the rear side (230 V power supply via EURO connector).

  3. Connect the DCF receiver / GPS antenna, Slave clock line cables, switch circuit and power cable.

  4. Switch-on 230 V mains power. The current time is displayed on the Master clock.