Installation#

Warning

The following places should be avoided:

  • Within the reach of high voltage operated equipment.

  • Places exposed to direct impact of solar radiation.

Installation Procedure#

  1. Snap the clock box onto the DIN rail 6M.

  2. Terminate all supply cables on the terminal box at the top of the clock box.

  3. The wall mounting case has holes for supply cables in the top and rear side of the case.

  4. Connect GPS antenna, Slave clock line cables, switch circuit and power cable.

  5. Switch-on mains power. The current time is displayed on the Master clock.