Flush mounting#

Panel mounting#

  1. Prepare opening for clock. Minimal dimensions should be W 126 x H 136 mm.

  2. Dismount front part of clock (frame with plexiglass and electronics) – it is fixed to rear part of clock by magnets.

  3. Pull the cables through the rubber grommet and insert the rear part of the clock to the prepared opening.

    Attention

    If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

    For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

  4. Pull fixing ″Z″ profiles one by one through rectangular openings on the sided of the rear part and fix them using supplied screws M4x12 DIN 7985. Fix the clock in panel using these mounting screws with appropriate torque.

  5. Mount the part of clock back.

Panel mounting accessible from rear side#

  1. Prepare opening for clock. Minimal dimensions should be W 126 x H 136 mm.

  2. Dismount front part of clock (frame with plexiglass and electronics) – it is fixed to rear part of clock by magnets.

  3. Insert rear part of clock to the prepared opening and mount profiles “L” on the sided of the clock using M4x12 DIN 7985 screws. Fix the clock into the opening using 4 mounting screws with appropriate torque.

  4. Pull the cables through the rubber grommet, mount connectors on the cables and connect them to the corresponding terminals on the clock control PCB.

    Attention

    If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

    For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

  5. Mount front part of clock back.

Wall flush mounting#

  1. Put a paper pattern on the wall. According to pattern drill wall plug holes Ø8 mm to a depth of 100 mm and mark the corners of the mounting opening.

  2. Prepare opening for the clock. Minimal dimensions W 131 x H 141 mm, depth 55 mm.

  3. Insert the dowels to the mounting holes Ø8 mm.

  4. Dismount front part of clock (frame with plexiglass and electronics) – it is fix to rear part of clock by magnets.

  5. Pull the cables through the rubber grommet. Insert the rear part of the clock into the opening and fix it slightly using 4 screws DIN 7982 ST3,5.

  6. Align the clock with the wall surface using 4 screws M5x12 DIN7985 and fix it using 4 screws DIN 7982 ST3,5 using appropriate torque.

  7. Mount connectors on the cables and connect them to the corresponding terminals on the clock control PCB.

    Attention

    If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

    For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

  8. Mount the front part of clock back.