Double sided#
First, prepare 4 holes in a ceiling / a wall by bracket flange pitch.
Insert a dowels to prepared holes and fix them into ceiling / wall using appropriate screws.
Remove screws on bottom of MASTER display. Remove bottom cover and plexiglass.
Except PoE variant, use power cable of at least 3 x 0.5 mm² (double isolation), maximal 3 x 1.5 mm² (double isolation).
Cut cable(s) to appropriate length and connect the wires to corresponding terminals or crimp the RJ45 jack to Ethernet cable respectively.
Attention
If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.
For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).
Connect cable from SLAVE display to MASTER display.
Mount the plexiglass and bottom cover back.