Double sided#
Prepare four holes in the ceiling (or the wall) by bracket flange pinch.
Insert the dowels to the prepared holes and fix into them the ceiling suspension (or the wall bracket) using appropriate screws.
Remove the screws on the bottom of the Master clock. Remove the bottom cover and plexiglass.
Cut the cable(s) to the appropriate length and connect the wires to corresponding terminals or crimp the RJ45 jack to the Ethernet cable respectively.
Attention
If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.
For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).
Connect the cable from SLAVE clock to the MASTER clock.
Mount the plexiglass and bottom cover.