Single sided#

  1. Prepare two holes in the wall by hinges pitch on the backside of the clock.

  2. Insert the dowels to the prepared holes and screw the appropriate screws into them.

  3. Remove the screws on the bottom of the clock. Remove the bottom cover and plexiglass.

  4. Thread the cable(s) through the grommet and hang the clock on the prepared screws in the wall.

  5. Cut the cable(s) to the appropriate length and connect the wires to corresponding terminals or crimp the RJ45 jack to the Ethernet cable respectively.

    Attention

    If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

    For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

  6. Mount the plexiglass and bottom cover.