Single sided#
DSC.100 – DSC.320#
Assemble the wall mounting console if delivered disassembled.
Drill at least four anchoring holes into the wall of a diameter adequate to appropriate screws, use the mounting console as a template.
Mount the console on the wall and put it into a fully tilted out position.
Shift the clock body into the flipped out console arms and fix it by tightening the screws.
Dismantle the back cover of connectors on the clock body. The cover incorporates gap with sealing for passage of cables in the inside of the clock.
Arrange all incoming cables to appropriate length and connect them to the appropriate terminals on the PCB. See the description of the connectors.
Caution
Observe the correct polarity where necessary.
Caution
For LGC variant, configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).
Navigate to Clock Operation chapter > Non-Network Clock Operation chapter to get detailed info about connection of various synchronization sources and receivers.
Fix the cables with the holder in correct positions in order to maintain regular spacing between the cables in the area of passing through sealing. Use appropriate force to not to damage the cables insulation.
Mount back the connector cover.
Tilt the clock into vertical position and fix the position of the console.
DSC.500#
Drill at least four anchoring holes into the wall of a diameter adequate to appropriate screws, as a template for marking the position of the holes use the wall bracket.
Mount the console to the wall using appropriate screws and dowels with respect to the material.
Loosen the hanging M10 Allen screws on console in order to be approx. 6 mm of thread visible.
Prepare the cables and fix them on the wall in order to be placed behind the small rectangular cover equipped with sealed slot.
Hang the display body onto the console in order to fit four hanging screws into the pear‑shaped holes.
Using special key unlock (turn by 90° clockwise) the two locks on the bottom of the frame and open the front window. Use the support to keep the front window opened.
Tighten four hanging screws using the Allen key, the display is then fixed on the wall.
Dismount the small rectangular cover on the bottom part of back panel, pull all cables through the opening and fix them by the metal bar. Mount the cover back. Make sure the cables are evenly distributed in the fixing bar and in the sealed slot.
Arrange and cut the cables to the appropriate length. Strip the wires and connect them to corresponding board terminals.
Caution
Observe the correct polarity where necessary.
Caution
For LGC variant, configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).
Navigate to Clock Operation chapter > Non-Network Clock Operation chapter to get detailed info about connection of various synchronization sources and receivers.
Apply the power and check if the display works correctly.
Close the front window and secure it using two locks (turn by 90° anticlockwise) on the bottom of the display body frame.
Dismount the mounting eyes and screw‑in the delivered covering Allen screws.