Single sided#

  1. Drill two anchoring holes into a wall of a diameter adequate to accommodate supplied wood-type screws with dowels. See the assembly diagram for appropriate hole spacing.

  2. Mount the hanging screws with the dowels to drilled holes in a way that the heads of the screws are approx. 3-5 mm from the wall.

  3. Shorten all incoming cables appropriately.

  4. Mount a wide 2-pin connector to incoming powering cable.

  5. Mount a 2-pin connector to synchronization signal cable or crimp RJ45 modular connector to incoming Ethernet cable.

  6. Connect all interconnecting cables into corresponding connectors in back side recess.

    Attention

    If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

    For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

  7. Hang the clock into hanging screws.

    • If the clock has to be tilted down slightly, cut the supporting element on bottom of back side accordingly.