Ceiling Suspension Mounting#

Step 1

../../../_images/eco-m-dsc-11.svg
  • Drill four anchoring holes into a ceiling of a diameter adequate to accommodate supplied wood-type screws with dowels.

  • Interlace incoming cables through suspension pipe. Fasten the ceiling suspension to ceiling using 4 wood-type screws of 5 mm diameter.

    Caution

    Hole for incoming cables diameter min. 30 mm.

Step 2

../../../_images/eco-m-dsc-21.svg
  • Connect all incoming cables to the pigtail lead from the clock.

Step 3

../../../_images/eco-m-dsc-31.svg
  • Slip-on the clock onto suspension.

  • Fix the connection by tightening the screws using Allen key.

Removing Glass#

If you need to connect other components (additional keyboards, temperature sensors, etc.) or configure the DIP switch, you need to remove the bottom cover and glass.

../../../_images/eco-m-dsc-glass-removal1.svg
  • Remove the screws on the bottom side of the clock. Remove bottom cover and glass.

  • Interlace incoming cables through suspension pipe.

  • Connect the wires of the respective components to the terminal block on control board according to the label.

    1

    See chapter Cable Connection.

  • After connecting components or configuring the DIP switch, use reverse procedure and mount back the glass and bottom cover.