Ceiling suspension mounting#

The double sided clock consists of two parts, one serving as the control module (this one encompasses the jacks to connect powering voltage, synchronization source, the temperature sensor and the keyboard to the clock), and the other one serving as the display module (with the terminal for the connection of the interconnecting cable). Both clock parts are interconnected via a 10‑core flat cable. The clock suspension part is delivered separately.

Step 1 – Securing the ceiling suspension pipe#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Interlace the incoming conductors through the pipe which servers as the clock suspension. Secure the ceiling suspension to the ceiling using 4 wood screws of 5 mm diameter.

Step 2 – Unlocking the clock#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

The frame is fixed using two suspensions (above) and two sliding springs (bottom). The frame is locked by frame catch from the bottom side of the frame.

Remove the blind cap from the opening and insert the Allen key into the opening. Turn the key softly in clockwise direction to unlock the frame catch.

Disconnect the interconnecting cables by decoupling the terminals on the control PCB.

Note

Models DC with digit height 57, 75 and 100 the frame catch is unclocked (the screw is already screwed in) when the clock is delivered. The is no need to remove the blind cap and insert the Allen key.

Step 3 – Removing anchoring plate#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Lift‑off the anchoring plate using a screwdriver inserted in between the sheet and the frame at the sliding spring point on the clock bottom side.

Disconnect the interconnecting cables by decoupling the terminals on the control PCB.

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Repeat then the process with other display part.

Step 4 – Fixing the anchoring plate to suspension pipe#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Interlace the incoming conductors through the pipe insert on the anchoring plate, to the side which finds itself to the opposite of the terminal board. Slip‑on the plate onto the suspension. Fix the connection by tightening the screw using an Allen key.

Important

The screws must fit into the upper groove on the pipe insert; otherwise, it will not be possible to mount a display part onto the anchoring plate.

After mounting the display part, it is possible to elevate the clock by securing the anchoring plate in a manner where the screws fit into the lower groove on the pipe insert.

Interlace the incoming conductors through the opening located next to the terminal board and  connect the conductors to the terminal board on the anchoring plate, in accordance with the descriptive nameplate. Give an appropriate shape to the conductors of cut them off at a length which does not obstruct the mounting of the clock onto the anchoring plate.

Step 5 – Connecting conductors & connectors#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Attention

If the clock is synchronized by LGC variant, please navigate to Clock Operation Non-Network Clock Operation to get detailed info about connection of various synchronization sources and receivers.

For LGC variant, check and configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).

Mount the connectors to the cable of the temperature sensor, to the keyboard cable, Ethernet cable or the RS-485 interface connectors if these have been delivered.

Step 6 – Suspending the clock onto the upper springs#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Place the display part of the clock to the anchoring plate, at a position which is opposite to the terminal board and suspend this part onto the upper strings. Interlace the 10‑core interconnecting cable through the lower opening which finds itself at the closest to the terminal board on the anchoring plate.

Snap the clock onto the springs by pushing on the lower frame part.

Caution

Care should be taken when placing the cables between the frame edge and the anchoring plate, so an not to nip them.

Connect the 10‑core interconnecting cable and the interconnecting cables into the corresponding plugs on the clock control PCB.

Push the temperature sensor connector, the keyboard connector, Ethernet connector or the RS-485 jacks into the corresponding terminals on the control PCB.

Warning

Be careful not to swap terminals. Check the markings of the jack‑plugs.

Step 7 – Snaping the clock onto the anchoring plate#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Snap both parts of the clock in onto the springs by pushing on the lower part of the frame.

Check whether the anchoring plate on the sides fits exactly into the grooves established in both parts of the digital clock (these must be pushed against each other in a way to mask the anchoring plate – after placing the parts the plate shall not be seen).

Step 8 – Securing the clock#

Rotate
Zoom
Pan
Rotate
Zoom
Pan

Remove the blind cap from the opening on the clock bottom side.

Insert Allen key into the opening on the clock bottom side. Turn the key softly in anticlockwise direction. The frame catch will snap in.

Replace the blind cap on the opening.

To dismount the clock, use reverse procedure.