Wall Mounting#
DSC.180–DSC.320#
Step 5
Dismantle the back cover of connectors on the clock unit body. The cover incorporates gap with sealing for passage of cables in the inside of the clock unit.
Step 6
Arrange all incoming cables to appropriate length and connect them to the appropriate terminals on the PCB. See the description of the connectors.
Caution
Observe the correct polarity where necessary.
Caution
For LGC variant, configure the position of DIP switch according to used synchronization signal (applies only for DCF, MOBALine, polarized impulse line or IRIG‑B).
Navigate to Clock Operation chapter > Non-Network Clock Operation chapter to get detailed info about connection of various synchronization sources and receivers.
Fix the cables with the holder in correct positions in order to maintain regular spacing between the cables in the area of passing through sealing. Use appropriate force to not to damage the cables insulation.
DSC.500#
TBA